Skip to main content

Case Studies

Filter

Sanctuaire (phase 4)

As in Phase 1 of this condo complex, RVE technologies were installed in Phase 4 in order to get parking spaces EV…

Gallery (phase 2)

DCC-9 and DCC-9-BOX were installed in Phase 2 of this 3-phase condo complex in order to get parking spaces EV Ready. The…

Gallery (phase 1)

DCC-9 and DCC-9-BOX were installed in Phase 1 of this 3-phase condo complex in order to get parking spaces EV Ready. The…

Sanctuaire (Phase 1)

DCC-9 were installed in Phase 1 of this 7-phase condo complex in order to get parking spaces EV Ready. The installation was…

Sommets sur le Fleuve 4

This condo complex in l’Île-des-Soeurs is 100% ready for EV charging thanks to the RVE technologies installed. The project benefited from the…