Case Studies

Projet de recharge pour les véhicules électriques en copropriété
151-Unit High-Rise – Part 2

151-Unit High-Rise – Part 2

Toutes les unités de cette copropriété rétrofit ont maintenant accès à la recharge grâce à l'installation d'un système de gestion de l'énergie…
167-Unit 2-Phase Mid-Rise

167-Unit 2-Phase Mid-Rise

The developer of this two-phase rental complex was looking for a solution to provide charging services to future tenants without having to…
151-Unit High-Rise

151-Unit High-Rise

An SMP+ was installed in this 151-unit condominium to allow residents to have a charging station in their parking space.
198-Unit High-Rise

198-Unit High-Rise

This two-phase condominium in Montreal is equipped with a HUB and with DCC+ technology, which allows current and future electric vehicle owners…
144-Unit Mid-Rise

144-Unit Mid-Rise

This 144-unit condominium in downtown Montreal is 100% EV Ready, thanks to the installation of RVE products for each parking space. Completed…
160-Unit Mid-Rise

160-Unit Mid-Rise

In addition to enabling all residents to charge their electric vehicles (EVs) at home and protecting the electrical infrastructure, the RVE technologies…
72-Unit High-Rise

72-Unit High-Rise

With the aim of giving all its residents access to electric vehicle charging at home, the Quintessence condo board opted for RVE…
146-Unit High-Rise

146-Unit High-Rise

This 7th phase of a Montreal condo complex followed in the footsteps of its neighboring phases to install electric vehicle charging stations,…
166-Unit High-Rise

166-Unit High-Rise

As in Phase 1 of this condo complex, RVE technologies were installed in Phase 4 in order to get parking spaces EV…
145-Unit High-Rise

145-Unit High-Rise

DCC-9 and DCC-9-BOX were installed in Phase 2 of this 3-phase condo complex in order to get parking spaces EV Ready. The…
132-Unit High-Rise

132-Unit High-Rise

DCC-9 and DCC-9-BOX were installed in Phase 1 of this 3-phase condo complex in order to get parking spaces EV Ready. The…
136-Unit High-Rise

136-Unit High-Rise

DCC-9 were installed in Phase 1 of this 7-phase condo complex in order to get parking spaces EV Ready. The installation was…
173-Unit High-Rise

173-Unit High-Rise

This condo complex in l’Île-des-Soeurs is 100% ready for EV charging thanks to the RVE technologies installed. The project benefited from the…