HOAs and Property Managers – EV charging in multifamily buildings seems challenging? We support you through it all.
See how

Case Studies

135-Unit Low-Rise

135-Unit Low-Rise

This condo complex in Washington State, consisting of townhouses and a multi-story building, chose to install SMP+ as the charging solution to…
60-Unit Mid-Rise (Portland, OR)

60-Unit Mid-Rise (Portland, OR)

In this 60-unit condo building in Portland, OR, some homeowners with assigned parking spaces wanted to install EV charging for their vehicles.…
61-Unit Low-Rise

61-Unit Low-Rise

RVE technologies were installed in the parking lots of this 61-unit condo building in Vancouver. The team at Relight Solutions completed the…
58-Unit Mid-Rise

58-Unit Mid-Rise

Following the installation of EV charging in Phase 2 of this condo complex in Saint-Lambert (QC), common infrastructure was also installed in…
127-Unit Mid-Rise

127-Unit Mid-Rise

This 8-phase condominium located in Montreal prepared Phase 3 of its complex for electric vehicle charging by installing RVE technologies. The installation…