Skip to main content

Case Studies

Filter

Atwater

DCC-9 and DCC-9-BOX were installed in this 40-unit condo complex in order to get parking…

Quartier 54

DCC-9 were installed in this 348-unit condo complex in Montreal in order to get parking…

Sanctuaire (phase 4)

As in Phase 1 of this condo complex, RVE technologies were installed in Phase 4…

Outremont

DCC-9 and DCC-9-BOX were installed in this 23-unit condo complex in order to get parking…

Logan Lane

RVE technologies were installed in the parking lots of this 61-unit condo building in Vancouver.…

Victoria (phase 4)

Following the installation of EV charging in Phase 2 of this condo complex in Saint-Lambert…

Victoria (phase 2)

To prepare this condo building in Saint-Lambert (QC) for EV charging, a common infrastructure was…

Gallery (phase 2)

DCC-9 and DCC-9-BOX were installed in Phase 2 of this 3-phase condo complex in order…

Gallery (phase 1)

DCC-9 and DCC-9-BOX were installed in Phase 1 of this 3-phase condo complex in order…

Metcalfe

DCC-9 were installed in this 33-unit condo complex in order to get parking spaces EV…

De la Commune (phase 3)

This 8-phase condominium located in Montreal prepared Phase 3 of its complex for electric vehicle…

Sommets sur le Fleuve 4

This condo complex in l’Île-des-Soeurs is 100% ready for EV charging thanks to the RVE…