Skip to main content

Case Studies

Filter

Atwater

DCC-9 and DCC-9-BOX were installed in this 40-unit condo complex in order to get parking spaces EV Ready. The installation was carried…

Outremont

DCC-9 and DCC-9-BOX were installed in this 23-unit condo complex in order to get parking spaces 100% EV Ready. The installation was…

Gallery (phase 2)

DCC-9 and DCC-9-BOX were installed in Phase 2 of this 3-phase condo complex in order to get parking spaces EV Ready. The…

Gallery (phase 1)

DCC-9 and DCC-9-BOX were installed in Phase 1 of this 3-phase condo complex in order to get parking spaces EV Ready. The…

De la Commune (phase 3)

This 8-phase condominium located in Montreal prepared Phase 3 of its complex for electric vehicle charging by installing RVE technologies. The installation…

Terra Nova

To enable home charging for all units of this Terrebonne rental building, the developer, Groupe GDI, planned to install the necessary infrastructure…

Sommets sur le Fleuve 4

This condo complex in l’Île-des-Soeurs is 100% ready for EV charging thanks to the RVE technologies installed. The project benefited from the…