Skip to main content

Case Studies

Filter

Installation extérieure de DCC-9-3R / Outdoor installation of DCC-9-3R

Outdoor installation

DCC-9-3R were installed outdoors in this new condo building of 7 units.

43-unit low-rise

Over the years, requests for having EV chargers installed multiplied, leading to the implementation of a 100% EV-Ready strategy in order to…

468-unit high-rise

This 3-phase condominium in Montreal prepared its parking spaces for electric vehicle charging by installing RVE technology.

40-unit low-rise

DCC-9 and DCC-9-BOX were installed in this 40-unit condo complex in order to get parking spaces EV Ready. The installation was carried…

348-unit mid-rise

DCC-9 were installed in this 348-unit condo complex in Montreal in order to get parking spaces EV Ready. The installation was carried…

166-unit high-rise

As in Phase 1 of this condo complex, RVE technologies were installed in Phase 4 in order to get parking spaces EV…

23-unit low-rise

DCC-9 and DCC-9-BOX were installed in this 23-unit condo complex in order to get parking spaces 100% EV Ready. The installation was…

61-unit low-rise

RVE technologies were installed in the parking lots of this 61-unit condo building in Vancouver. The team at Relight Solutions completed the…

58-unit mid-rise

Following the installation of EV charging in Phase 2 of this condo complex in Saint-Lambert (QC), common infrastructure was also installed in…

42-unit mid-rise

To prepare this condo building in Saint-Lambert (QC) for EV charging, a common infrastructure was installed to ensure a smooth implementation of…

145-unit high-rise

DCC-9 and DCC-9-BOX were installed in Phase 2 of this 3-phase condo complex in order to get parking spaces EV Ready. The…

132-unit high-rise

DCC-9 and DCC-9-BOX were installed in Phase 1 of this 3-phase condo complex in order to get parking spaces EV Ready. The…

136-unit high-rise

DCC-9 were installed in Phase 1 of this 7-phase condo complex in order to get parking spaces EV Ready. The installation was…

33-unit mid-rise

DCC-9 were installed in this 33-unit condo complex in order to get parking spaces EV Ready. The installation was carried out by…

127-unit mid-rise

This 8-phase condominium located in Montreal prepared Phase 3 of its complex for electric vehicle charging by installing RVE technologies. The installation…

42-unit low-rise

This 42-unit condominium in Montreal prepared its parking spaces for electric vehicle charging by installing RVE technology.

222-Unit Mid-Rise

To enable home charging for all units of this Terrebonne rental building, the developer, Groupe GDI, planned to install the necessary infrastructure…

173-Unit High-Rise

This condo complex in l’Île-des-Soeurs is 100% ready for EV charging thanks to the RVE technologies installed. The project benefited from the…