167-Unit 2-Phase Mid-Rise

167-Unit 2-Phase Mid-Rise

The developer of this two-phase rental complex was looking for a solution to provide charging services to future tenants without having to…
135-Unit Low-Rise

135-Unit Low-Rise

This condo complex in Washington State, consisting of townhouses and a multi-story building, chose to install SMP+ as the charging solution to…
151-Unit High-Rise

151-Unit High-Rise

An SMP+ was installed in this 151-unit condominium to allow residents to have a charging station in their parking space.
60-Unit Mid-Rise (Portland, OR)

60-Unit Mid-Rise (Portland, OR)

In this 60-unit condo building in Portland, OR, some homeowners with assigned parking spaces wanted to install EV charging for their vehicles.…
198-Unit High-Rise

198-Unit High-Rise

This two-phase condominium in Montreal is equipped with a HUB and with DCC+ technology, which allows current and future electric vehicle owners…
12-Unit Low-Rise Rental Building

12-Unit Low-Rise Rental Building

This newly-constructed 12-unit rental building is now equipped with a charging infrastructure for each tenant, thanks to the installation of RVE products.
DCC-12 in multifamily buildings - DCC-12 en multilogement
20-Unit Low-Rise

20-Unit Low-Rise

The DCC-12s installed in this San Francisco condominium gave residents access to electric vehicle charging stations. The installation, completed in 2024, was…
144-Unit Mid-Rise

144-Unit Mid-Rise

This 144-unit condominium in downtown Montreal is 100% EV Ready, thanks to the installation of RVE products for each parking space. Completed…
Installation extérieure de DCC-9-3R / Outdoor installation of DCC-9-3R
Outdoor Installation

Outdoor Installation

DCC-9-3R were installed outdoors in this new condo building of 7 units.
160-Unit Mid-Rise

160-Unit Mid-Rise

In addition to enabling all residents to charge their electric vehicles (EVs) at home and protecting the electrical infrastructure, the RVE technologies…
72-Unit High-Rise

72-Unit High-Rise

With the aim of giving all its residents access to electric vehicle charging at home, the Quintessence condo board opted for RVE…
146-Unit High-Rise

146-Unit High-Rise

This 7th phase of a Montreal condo complex followed in the footsteps of its neighboring phases to install electric vehicle charging stations,…
43-Unit Low-Rise

43-Unit Low-Rise

Over the years, requests for having EV chargers installed multiplied, leading to the implementation of a 100% EV-Ready strategy in order to…
468-Unit High-Rise

468-Unit High-Rise

This 3-phase condominium in Montreal prepared its parking spaces for electric vehicle charging by installing RVE technology.
40-Unit Low-Rise

40-Unit Low-Rise

DCC-9 and DCC-9-BOX were installed in this 40-unit condo complex in order to get parking spaces EV Ready. The installation was carried…
348-Unit Mid-Rise

348-Unit Mid-Rise

DCC-9 were installed in this 348-unit condo complex in Montreal in order to get parking spaces EV Ready. The installation was carried…
166-Unit High-Rise

166-Unit High-Rise

As in Phase 1 of this condo complex, RVE technologies were installed in Phase 4 in order to get parking spaces EV…
23-Unit Low-Rise

23-Unit Low-Rise

DCC-9 and DCC-9-BOX were installed in this 23-unit condo complex in order to get parking spaces 100% EV Ready. The installation was…
61-Unit Low-Rise

61-Unit Low-Rise

RVE technologies were installed in the parking lots of this 61-unit condo building in Vancouver. The team at Relight Solutions completed the…
58-Unit Mid-Rise

58-Unit Mid-Rise

Following the installation of EV charging in Phase 2 of this condo complex in Saint-Lambert (QC), common infrastructure was also installed in…
42-Unit Mid-Rise

42-Unit Mid-Rise

To prepare this condo building in Saint-Lambert (QC) for EV charging, a common infrastructure was installed to ensure a smooth implementation of…
145-Unit High-Rise

145-Unit High-Rise

DCC-9 and DCC-9-BOX were installed in Phase 2 of this 3-phase condo complex in order to get parking spaces EV Ready. The…
132-Unit High-Rise

132-Unit High-Rise

DCC-9 and DCC-9-BOX were installed in Phase 1 of this 3-phase condo complex in order to get parking spaces EV Ready. The…
136-Unit High-Rise

136-Unit High-Rise

DCC-9 were installed in Phase 1 of this 7-phase condo complex in order to get parking spaces EV Ready. The installation was…
33-Unit Mid-Rise

33-Unit Mid-Rise

DCC-9 were installed in this 33-unit condo complex in order to get parking spaces EV Ready. The installation was carried out by…
127-Unit Mid-Rise

127-Unit Mid-Rise

This 8-phase condominium located in Montreal prepared Phase 3 of its complex for electric vehicle charging by installing RVE technologies. The installation…
42-Unit Low-Rise

42-Unit Low-Rise

This 42-unit condominium in Montreal prepared its parking spaces for electric vehicle charging by installing RVE technology.
222-Unit Mid-Rise

222-Unit Mid-Rise

To enable home charging for all units of this Terrebonne rental building, the developer, Groupe GDI, planned to install the necessary infrastructure…
173-Unit High-Rise

173-Unit High-Rise

This condo complex in l’Île-des-Soeurs is 100% ready for EV charging thanks to the RVE technologies installed. The project benefited from the…