Skip to main content
Close Search
Menu
About
Our Team
Our Products
DCC-9
DCC-11
DCC-12
DCC-BOX
DCC-PCB
Careers
Resources
Case Studies
Blog
Useful Documentation
FAQ
Contact
Where To Buy Our Products
How To Get A Quote
English – USA
English – Canada
Français – Canada
Case Studies
Construction
Existing building
New building
Occupancy
Condo
Rental
Single-family home
Products used
DCC-9
DCC-11
DCC-12
DCC-9-BOX
DCC-9-BOX3
DCC-9-BOX6
DCC-11-BOX
SMP
Building size
25 units and less
26 to 50 units
51 to 100 units
101 to 200 units
201 to 300 units
301 units and more
Parking spaces
25 spaces and less
26 to 50 spaces
51 to 100 spaces
101 to 200 spaces
201 to 300 spaces
301 spaces and more
Meter(s)
Individual meters
Single meter
Individual and single meters
Back to All Case Studies
[RESULT-MESSAGE]
Clairevue
Over the years, requests for having EV chargers installed multiplied, leading to the implementation of a 100% EV-Ready strategy in order to…
Atwater
DCC-9 and DCC-9-BOX were installed in this 40-unit condo complex in order to get parking spaces EV Ready. The installation was carried…
Quartier 54
DCC-9 were installed in this 348-unit condo complex in Montreal in order to get parking spaces EV Ready. The installation was carried…
Sanctuaire (phase 4)
As in Phase 1 of this condo complex, RVE technologies were installed in Phase 4 in order to get parking spaces EV…
Outremont
DCC-9 and DCC-9-BOX were installed in this 23-unit condo complex in order to get parking spaces 100% EV Ready. The installation was…
Logan Lane
RVE technologies were installed in the parking lots of this 61-unit condo building in Vancouver. The team at Relight Solutions completed the…
Victoria (phase 4)
Following the installation of EV charging in Phase 2 of this condo complex in Saint-Lambert (QC), common infrastructure was also installed in…
Victoria (phase 2)
To prepare this condo building in Saint-Lambert (QC) for EV charging, a common infrastructure was installed to ensure a smooth implementation of…
Gallery (phase 2)
DCC-9 and DCC-9-BOX were installed in Phase 2 of this 3-phase condo complex in order to get parking spaces EV Ready. The…
Gallery (phase 1)
DCC-9 and DCC-9-BOX were installed in Phase 1 of this 3-phase condo complex in order to get parking spaces EV Ready. The…
Sanctuaire (Phase 1)
DCC-9 were installed in Phase 1 of this 7-phase condo complex in order to get parking spaces EV Ready. The installation was…
Metcalfe
DCC-9 were installed in this 33-unit condo complex in order to get parking spaces EV Ready. The installation was carried out by…
De la Commune (phase 3)
This 8-phase condominium located in Montreal prepared Phase 3 of its complex for electric vehicle charging by installing RVE technologies. The installation…
Terra Nova
To enable home charging for all units of this Terrebonne rental building, the developer, Groupe GDI, planned to install the necessary infrastructure…
Single-family home in San Jose, CA
This 30-year-old home seamlessly accommodated RVE technology to power an electric vehicle charger. The work was completed in 2022 by the team…
Sommets sur le Fleuve 4
This condo complex in l’Île-des-Soeurs is 100% ready for EV charging thanks to the RVE technologies installed. The project benefited from the…
Close Menu
About
Our Team
Our Products
DCC-9
DCC-11
DCC-12
DCC-BOX
DCC-PCB
Careers
Resources
Case Studies
Blog
Useful Documentation
FAQ
Contact
Where To Buy Our Products
How To Get A Quote
English – USA
English – Canada
Français – Canada