60-Unit Mid-Rise
In this 60-unit condo building in Portland, OR, some homeowners with assigned parking spaces wanted to install EV charging for their vehicles. Any electrical modification required approval from the Homeowners’ Association (HOA), which imposed constraints related to budget, construction methods, and electrical capacity. The solution? RVE energy management products, skillfully installed by the Cox Electric team.
Technical Specifications
Type of construction
existing building (retrofit)
Type of occupation
condo
Building size
51 to 100 units
Number of floors
6 to 10
Number of parking spaces
25 or less
Location of electricity meters
accessible and inaccessible
Location of parking spaces
indoor, covered
Type of parking spaces
assigned
Products used
Challenge
Find a solution that would allow EV charging installations without requiring a costly building electrical service upgrade, while ensuring compliance with electrical codes and minimizing the HOA’s involvement in billing and administration.
Solution
3 options were evaluated while looking for a solution.
Option 1 – Level 3 Charger(s)
Chargers shared between condo owners
Requires connection to a 480V distribution panel
Requires a new electric meter for utility billing
Outcome:
This option was a non-starter. The high cost, requirement for dedicated parking spaces, and major electrical infrastructure upgrades made it impractical for the building.
Option 2 – Level 2 Chargers (Powered by the House Panel)
Shared or dedicated chargers
Requires new 208V or 240V transformer(s) and new house panel(s)
Outcome:
This option was not ideal. There were no shared parking spaces available, and the HOA would have had to fund the installation and manage payments and billing for the benefit of a limited number of owners.
Option 3 – Level 2 Chargers (Powered by Individual Condo Electrical Service)
Dedicated chargers for parking space owners
Connection to each unit’s individual electrical service
Outcome:
This option appeared to be the best solution—if the electrical challenges could be addressed.
Based on this evaluation, the third option was selected. The DCC-9 provided the load management required to make this approach viable. 4 DCC-9 were installed, combined with subpanels to distribute power to both the 120V service receptacle and the new EV charger receptacle.
Key Benefits of the Solution
- Does not require wiring directly to the condo or apartment electrical panel
- Allows EV charger installation when the existing panel would not otherwise have sufficient capacity
- Prevents overload by dynamically shedding load when required
- Complies with NEC Article 750 load management requirements
- Scalable solution: chargers can be installed for some units now, and additional units later
- Eliminates the need for a building-wide electrical service upgrade
By using load management instead of increasing electrical capacity, the HOA was able to approve a practical, code-compliant, and cost-effective solution. Individual homeowners gained access to dedicated EV charging, while the association avoided major infrastructure upgrades and ongoing administrative responsibilities.