Case Study
Atwater
RVE technologies were installed in this 40-unit condo complex in order to get parking spaces EV Ready. The installation was carried out by the team at Lilco Électrique inc.
Technical Specifications
Type of construction
existing building (retrofit)
Type of occupancy
condo
Building size
26 to 50 units
Number of floors
5 or less
Number of parking spaces
26 to 50
Location of electricity meters
accessible from the parking spaces
Location of parking spaces
indoor, covered
Type of parking spaces
assigned
Products used
Challenge
Powering an electric vehicle charging infrastructure in a multi-unit building where the electric meters are located in the garage basement (accessible).
Solution
Using a homogenous solution was possible to power charging infrastructure between the units of this condo building and the EV chargers that were requested to be installed. Indeed, all meters are accessible, allowing the use of DCCs everywhere. Due to the building’s age, among other things, it was necessary to carry out all the DCC installations at the same time rather than to carry out individual installations.
- DCC-9-BOX to provide charging infrastructure without installing chargers right away
- DCC-9 for units with an electrical panel of 125A and less in need of a charger now