151-Unit High-Rise – Part 2
After a first smart charging project completed with RVE, this condominium undertook a second charging project so that every co-owner can have access to a charging station at their parking space. This second part illustrates the ability of the RVE ecosystem to grow with a building’s needs: without increasing the electrical service, the infrastructure was extended by adding a multi-level electric vehicle energy management system (EVEMS).
Technical Specifications
Type of construction
existing building (retrofit)
Type of occupancy
condominium
Building size
101 to 200 units
Number of floors
20 to 30
Number of parking spaces
101 to 200
Location of electricity meters
accessible and inaccessible
Location of parking spaces
indoors, covered
Type of parking spaces
assigned
Products used
Challenge
In a high-demand area, the utility could not increase the electrical service of the building, built in 1982, capping the power available to electrify the entire parking area at 150 A. The syndicate therefore had to find a way to offer charging to all of its condo owners, whether or not they have an accessible meter, without ever exceeding that limit.
Solution
To meet this new wave of requests without exceeding the 150 A limit, RVE evolved the system installed in Part 1 by designing a four-level energy management architecture.
Installation of 2 HUBs
- Dynamic load control based on charging needs and the building’s energy consumption;
- Optimal distribution of energy among multiple electric vehicles.
Installation of 3 SMP+ and upgrade of the one installed during Part 1
- Solution when it is not possible to power the charging station from the unit’s meter; connecting multiple charging stations to a single power source;
- Access to automated billing for each user, without local manual management;
- Access to electricity consumption data for the panel and each charging station.
Installation of DCC+
- Direct connection to each unit’s electricity meter, enabling automated billing for charging;
- No recurring costs, monthly subscription fees, or management fees.
This system monitors and controls 1) the main electrical service, 2) the electrical capacity dedicated to the common charging stations, 3) the common transformer serving several SMP+ units, and 4) the distribution panel for the SMP+ units.
The project therefore meets today’s needs while being ready for tomorrow: 46 stations are already in service and, in time, each of the 151 units will be able to have its own.
The project, which benefited from a grant available in the area, not only gives residents access to efficient charging and an equitable allocation of energy and related costs, but also adds value to each unit and ensures the longevity of the building.
“We were extremely well guided [by RVE] on the solutions [to the] electrical capacity problems in the building. […] The benefit for owners is having a charging station when they need one at each of their parking spaces. It’s added value when they sell their parking space. And we’re also ensuring the longevity of the building and the ability to offer [charging] even though our building isn’t a recent one.”
Laurie Simard
Administrator of the condo association