Case Study
167-Unit Mid-Rise
The developer of this two-phase rental complex was looking for a solution to provide charging services to future tenants without having to manage billing for their electricity usage or oversize the electrical infrastructure. They opted for the SMP+ solution.
Challenge
Provide a charging infrastructure for electric vehicles in a multi-unit residential building where residents’ individual electricity meters are inaccessible from the parking spaces; allow for flexibility in assigning parking spaces to tenants based on their need for access to a charging station.
Solution
To power the charging infrastructure for the 167 units in each of the two phases, the SMP+ was selected:
- 2 x SMP-21 (one per phase)
Conduits to prepare for the future installation of a second SMP in each phase - Preliminary conduits (in the concrete slab) for the installation of a third SMP per phase
- 21 charging stations were also installed in each phase.
Benefits of the SMP+ solution:
- Allows up to 21 charging stations to be connected from the same power source, maximizing every available kilowatt-hour thanks to its automatic load shedding algorithm.
- Compatible with all brands of electrical panels and charging stations.
- No recurring fees or management fees.
- Limits power demand to reduce electricity costs and avoid the penalties associated with high power demand.
- Wired Internet connection: cheaper and more reliable than wireless systems.
- No billing management of user consumption is required.
- Ideal for rental properties: the charging station is linked to the parking space, not to the unit.
- Access to the Connect Portal, which allows for billing by kWh of each user’s electricity consumption