Metcalfe

RVE technologies were installed in this 33-unit condo complex in order to get parking spaces EV Ready. The installation was carried out by the team at Lilco Electric inc.

Technical Specifications

Type of construction

existing building (retrofit)

Type of occupancy

condo

Building size

26 to 50 units

Number of floors

6 to 10

Number of parking spaces

26 to 50

Location of electricity meters

accessible from the parking spaces

Location of parking spaces

indoor, covered

Type of parking spaces

assigned

Products Used

Challenge

Powering an electric vehicle charging infrastructure in a multi-unit building where the electric meters are located in the garage basement (accessible).

Solution

To power a charging infrastructure for the units of this condominium wishing to have a charger installed, a homogeneous solution was possible. Indeed, the parking spaces where the chargers were to be installed are located on the two indoor parking floors and the electrical room is located on the first parking floor, thus making the parking meters accessible.

The DCC was chosen as the charging solution:

  • DCC-9 for units with an electrical panel of 125A and less wanting a charger now
DCC-9
DCC-9
DCC-9