Case Study
Metcalfe
RVE technologies were installed in this 33-unit condo complex in order to get parking spaces EV Ready. The installation was carried out by the team at Lilco Electric inc.
Technical Specifications
Type of construction
existing building (retrofit)
Type of occupancy
condo
Building size
26 to 50 units
Number of floors
6 to 10
Number of parking spaces
26 to 50
Location of electricity meters
accessible from the parking spaces
Location of parking spaces
indoor, covered
Type of parking spaces
assigned
Products Used
Challenge
Powering an electric vehicle charging infrastructure in a multi-unit building where the electric meters are located in the garage basement (accessible).
Solution
To power a charging infrastructure for the units of this condominium wishing to have a charger installed, a homogeneous solution was possible. Indeed, the parking spaces where the chargers were to be installed are located on the two indoor parking floors and the electrical room is located on the first parking floor, thus making the parking meters accessible.
The DCC was chosen as the charging solution:
- DCC-9 for units with an electrical panel of 125A and less wanting a charger now