Case Study
Terra Nova, Phases 2B&C
To enable home charging for all units of this Terrebonne rental building, the developer, Groupe GDI, planned to install the necessary infrastructure before the building was even constructed. This approach simplified the planning of this infrastructure and saved time and money at all levels. The project benefited from the expertise of the engineering firm Desjardins Experts Conseils and the team at FJP Electric Inc. for the skillfully executed installation.
TECHNICAL SPECIFICATIONS
Type of construction
new build
Type of occupancy
rental
Building size
201 to 300 units
Number of floors
6 to 10
Number of parking spaces
201 to 300
Location of electricity meters
accessible from the parking spaces
Location of parking spaces
indoor, covered
Type of parking spaces
assigned
PRODUCTS USED
CHALLENGE
Powering an electric vehicle charging infrastructure in a multi-unit building where the electric meters are located in the garage basement (accessible).
Solution
To power a charging infrastructure for the 222 units of this condominium, a homogeneous solution was possible. Indeed, all meters are accessible, allowing the use of DCCs everywhere.
- DCC-9-BOX, DCC-9-BOX3 et DCC-9-BOX6 to provide charging infrastructure without installing chargers right away
- DCC-9 for units with an electrical panel of 125A and less wanting a charger now
“Groupe GDI worked with RVE to plan and design the electric car charging infrastructure for TerraNova2. RVE was a valuable partner in finding and executing a viable long-term strategy. RVE’s technology stands out for its flexibility, ease of installation and affordable price.”
Mathieu Lamarche
President and Founder of Groupe GDI